Free Construction
Proposal Template
The client-facing document that wraps your bid: a cover letter, a plain-language scope, exclusions, a schedule, a payment schedule, and a signature block. Grab the PDF, Word, Excel, or Google Sheets version below.
No signup required. Fill it in, send it, get it signed.
Sample layout. Not a price.
⭐ 4.8 Stars
📱 App Store
📱 Google Play
Every Section a Construction Proposal Needs

A construction bid is a price. A construction proposal is the document that wraps that price in everything a client actually reads before they sign: who you are, what you will do, what you will not do, when, and how they pay. Six sections carry that whole job.
Cover letter
Two or three sentences that show you understood the project, addressed to the client by name, before a single number appears.
Scope of work narrative
Plain language, not a line-item takeoff. What you are doing, phase by phase, so a client who has never read a bid before still follows it.
Exclusions
What is NOT in the price. Spell it out, because an unclear exclusion becomes a scope dispute after the work has already started.
Schedule
Start date, estimated completion, and how many working days you are counting on before weather or supply delays.
Payment schedule
A deposit, then milestone payments tied to what actually happened on site, not just a due date at the end.
Signature block
A line for the contractor and a line for the client. The proposal becomes an agreement once both sign it.
Pricing the job before you write the proposal? Turn a photo into an itemized estimate in about 6 seconds with SimplyWise Cost Estimator →. It is free to try.
Construction Proposal vs. Construction Bid
Related documents, different jobs. Here is where they split.
| What the document does | Bid | Proposal |
|---|---|---|
| Core content | A fixed price submission: line items, totals, and terms. | The bid wrapped in a story: cover letter, plain-language scope, exclusions. |
| Audience | Often a GC or a procurement desk comparing several bids. | Usually the homeowner or property owner deciding who to hire. |
| Schedule and payment terms | May reference them briefly or leave them for the contract. | States both in full, including the milestone payment schedule. |
| Exclusions | Sometimes a short list, sometimes assumed. | A dedicated section, spelled out before a client signs. |
| Acceptance | Awarded or rejected, sometimes without a signature. | Ends in a signature block for both parties. |
Need the bid itself first. SimplyWise ships a construction bid template built for the price submission; this page is the narrative document that wraps it. Or skip the paperwork. Turn a photo into an itemized estimate in about 6 seconds with SimplyWise Cost Estimator →. It is free to try.
How to Write a Construction Proposal in 5 Steps
Step 1: Open with a cover letter that shows you understood the job
Name the property, reference something specific from the walkthrough or the plans, and state what you are proposing in one sentence. Skip the boilerplate greeting.
Step 2: Write the scope narrative in plain language
Describe the work phase by phase the way you would explain it standing in the kitchen, not the way a takeoff spreadsheet lists it. The bid has the line items. The proposal has the story.
Step 3: State exclusions before the client asks about them
List what is not included: permits, design fees, owner-supplied fixtures, anything outside the scope above. An unclear exclusion is a scope dispute waiting to happen.
Step 4: Attach the schedule and the payment schedule
Give a start date and an estimated completion date, then break payment into milestones tied to what has actually happened on site, not just a due date at the very end.
Step 5: Close with a signature block, not a legal lecture
End with a line for the contractor and a line for the client. Keep the language plain. Have your own attorney review any contract wording your state requires before you send it out.
Worked Example: A Kitchen Remodel Proposal
Solstice Build Co. walked a kitchen remodel with Renee Alvarado. The scope covers demo, cabinetry, counters, and finish work. The proposal goes out two days after the walkthrough, ahead of a signed bid.
The proposal, block by block
- Cover letter. Two sentences naming the kitchen layout and the timeline Renee asked about at the walkthrough.
- Scope narrative. Demo of existing cabinets and counters, new cabinet install, counter template and install, backsplash, paint, and final cleanup, described phase by phase.
- Exclusions. Appliance purchase, plumbing fixture upgrades beyond a like-for-like swap, and any electrical panel work.
- Schedule. Estimated start date, estimated completion date, and the working days built in for cabinet lead time.
- Payment schedule. Deposit at signing, a materials milestone once cabinets and counters are on site, a rough-in milestone, a substantial-completion milestone, and a final milestone at walkthrough.
- Signature block. A line for Solstice Build Co. and a line for Renee, each with a date.
Figures on this page are placeholders that show how the sections fill in. They are not a price for kitchen remodel work. Price the job with the construction calculators before you write a number on anything.
What Is Actually in the Files Above
The PDF and Word document carry the full proposal, in order. The Excel workbook and Google Sheets version carry only the payment schedule, as a standalone worksheet.
Cover letter
A greeting field, a short paragraph you fill in, and a closing line with your name and title.
Scope of work narrative
Three prompts: project overview, scope by phase, and materials and specifications, each with blank space for your own wording.
Exclusions
A six-line starter list (permits, design fees, owner-supplied items, landscaping and other out-of-scope work, unforeseen conditions, and change orders) that you edit to fit the job.
Schedule
Estimated start date, estimated completion date, estimated working days, and a field for weather or supply contingency days.
Payment schedule
Five milestone rows (deposit, materials and mobilization, rough-in, substantial completion, final completion). The PDF and Word version list a milestone name, what triggers it, a percent of contract column, and an amount column. The Excel workbook and Google Sheets version add a fifth column, what it covers, plus a running total; Excel calculates the amount due and running total from the percent column and the contract price automatically, and the Google Sheets version ships flat, for import.
Payment methods
Check, bank transfer, or a payment app handle. There is no card number field anywhere in these files.
Acceptance and signatures
A short acceptance note plus a signature line and a date line for the contractor, and the same for the client. This page and the files are not legal advice; contract language and disclosures required in your state are a question for your own attorney, not this template.
Every percent, amount, and date cell ships blank. You fill in your own numbers for your own job. Or price the job first with SimplyWise Cost Estimator →. It is free to try.
The Free Template vs. Running It in the App
No cost
- Cover letter, scope, exclusions, schedule, and signature blocks.
- PDF, Word, Excel, Google Sheets.
- Auto totals on the payment schedule in Excel.
- You write the scope narrative yourself.
SimplyWise App
- Photo to itemized estimate in about 6 seconds.
- Material pricing pulled for your ZIP code.
- Turn a saved estimate straight into a professional, branded quote.
- Client signs to approve the quote.
- $29.99/mo or $239.99/yr, about $20/mo on annual, 7-day free trial.
Frequently Asked Questions
Proposal vs. bid
Filling out the proposal
More Free Templates for Contractors
Construction Bid Template
The fixed-price submission this proposal wraps around.
Contractor Invoice Template
Bill the job once the proposal is signed and the work is done.
Construction Calculators
Price the job before you write the scope narrative or the payment schedule.
A note on the numbers on this page
The hero preview and the worked example above are illustrative only, using a fictional business and client to show how the sections fill in. Neither one shows a dollar figure, a market price for a kitchen remodel or any other job, or any number sourced from a pricing publisher. The downloadable files ship with every percent, amount, and date cell empty. You fill in your own numbers for your own job. This page and the attached files are not legal advice. Contract language, required disclosures, and licensing rules vary by state, so have your own attorney review any proposal before a client signs it.
Ready to price the job this proposal describes?
SimplyWise turns a photo into an itemized estimate in about 6 seconds. Free to try, then $29.99/mo or $239.99/yr.