Free Contractor Invoice Template | Download PDF, Excel, Sheets

Templates  >  Contractor  >  Invoice Template

Free Contractor Invoice
Template

Professional estimate template used by 50,000+ contractors. Download instantly in PDF, Excel, or Google Sheets. Fill it out in under 3 minutes.

No signup required. Just download and start estimating.

Downloaded 12,000+ times

CONTRACTOR INVOICE
Apex Construction LLC
Bill to: Westfield Property Group
4500 Commerce Blvd, Dallas, TX 75201
Invoice #: INV-2026-0418  |  Due: May 15, 2026
Phase 1: Foundation work (complete)$18,500
Phase 2: Framing + rough-in (complete)$32,000
Phase 3: Electrical + plumbing rough$14,500
Change order #1: Added bathroom$8,200
Materials (lumber, concrete, fixtures)$22,000
Equipment rental (crane, compactor)$3,800
BALANCE DUE
$96,451

Trusted by 50,000+ contractors
⭐ 4.8 Stars
📱 App Store
📱 Google Play
🏆 #1 Estimating App

What Every Contractor Invoice Should Include

Company name, license number, and contact info
Client name and project address
Itemized work completed with dates and phase references
Materials and equipment costs with receipts referenced
Labor hours by trade with rates and crew details
Change orders with approved amounts and signatures
Retainage holdback amount and release terms
Payment terms (Net 30, Net 60) with late fee schedule
Invoice number and reference to original contract
Lien waiver status and compliance documentation
Subtotal, tax, and retainage calculations shown clearly
Accepted payment methods and remittance instructions

How to Write a Contractor Invoice in 5 Steps

1

Step 1: Reference the Contract

Every invoice should tie back to the original contract or estimate. Include the contract number, project name, and relevant phase. This prevents disputes and makes payment processing faster for commercial clients.

2

Step 2: Itemize Completed Work

List each completed phase or milestone with dates. Reference the original scope for each item. If the work matches the contract exactly, say so. If there are variations, note them and reference the approved change order.

3

Step 3: Document Change Orders

Change orders get their own line items with approval dates and signatures. Never bury extra work in existing line items. It invites disputes. Clear change order documentation is the #1 way to avoid payment problems.

4

Step 4: Calculate Retainage and Terms

Most commercial contracts hold 5-10% retainage until project completion. Show the retainage calculation, running total held, and release conditions. For residential, specify deposit credited, progress payments, and final payment terms.

5

Step 5: Send and Track Payment

Send invoices within 48 hours of completing a milestone. Include multiple payment options (check, ACH, credit card). For Net 30 terms, follow up at Day 15, Day 28, and Day 31. Consistent follow-up is the difference between 30-day and 90-day collections.

Average Contractor Project Costs to Benchmark Your Invoices

Use these benchmarks as starting points. Actual costs vary by region, materials, and job complexity.

Job Type Material Cost Labor Cost Total Range
Kitchen remodel (mid-range) $15,000 – $25,000 $10,000 – $20,000 $30,000 – $50,000
Bathroom remodel (full) $8,000 – $15,000 $6,000 – $12,000 $18,000 – $30,000
Room addition (200 sq ft) $20,000 – $35,000 $15,000 – $25,000 $40,000 – $70,000
Deck build (400 sq ft composite) $6,000 – $12,000 $4,000 – $8,000 $12,000 – $22,000
Basement finishing (1,000 sq ft) $10,000 – $20,000 $8,000 – $15,000 $20,000 – $40,000
Whole-home renovation $40,000 – $80,000 $30,000 – $60,000 $80,000 – $160,000

Costs vary by region. Get a location-specific estimate in 6 seconds with SimplyWise AI Estimator →

Invoicing Best Practices for Contractors

1

Invoice immediately after milestones

Don’t wait until the end of the month. Send invoices within 48 hours of completing each phase. Delayed invoicing signals you don’t need the money, which trains clients to deprioritize your payments.

2

Always reference the contract

Every invoice should include the contract number, project name, and specific phase being billed. Commercial clients process dozens of invoices weekly. Make yours easy to match, approve, and pay.

3

Include lien waiver with every invoice

Conditional lien waivers for current invoices, unconditional for past invoices already paid. GCs and property owners expect them. Having them ready speeds up payment by 5-10 days.

4

Track retainage separately

Show cumulative retainage held on every invoice. Both parties should always agree on the total held. Disputes over retainage at project close are the #1 source of contractor payment conflicts.

5

Offer multiple payment methods

Accept ACH, credit cards, checks, and wire transfers. Every friction point costs you 5-10 days. For credit cards, build the 3% processing fee into your markup rather than adding it as a surcharge.

6

Send payment reminders automatically

Day 15: friendly reminder. Day 28: formal notice. Day 31: past due with late fee. Automation removes the awkwardness and ensures consistent follow-up. Most accounting software handles this.

Estimate Template vs. Estimating Software

Free Template

Free

  • ✓ Pre-filled line items
  • ✓ PDF, Excel, Google Sheets
  • ✓ Print or email to clients
  • ✓ Manual updates required
  • ✓ No cost database
Free to Try

SimplyWise App

  • ✓ Photo-to-estimate in 6 seconds
  • ✓ Live material pricing by ZIP code
  • ✓ Professional PDF estimates + invoices
  • ✓ Send directly to clients
  • ✓ Track all your estimates

Try SimplyWise Free →

Frequently Asked Questions

What’s the difference between an invoice and an estimate?
An estimate is a projection of costs before work starts. An invoice is a bill for work already completed. Your invoice should reference the original estimate or contract so the client can verify the charges match the agreed scope.
When should I send an invoice?
Immediately after completing a milestone, phase, or the final work. For progress billing, invoice at each agreed milestone (foundation, framing, rough-in, finish). The faster you invoice, the faster you get paid.
How do I handle change orders on invoices?
List each change order as a separate line item with the approval date, description, and amount. Reference the signed change order document. Never combine change order work with original scope line items.
What payment terms are standard for contractors?
Residential: deposit (25-50%) + progress payments + final payment at completion. Commercial: Net 30 is standard, with retainage (5-10%) held until substantial completion. Always specify terms before starting work.
Should I charge late fees on overdue invoices?
Yes. A 1.5% monthly late fee (18% annualized) is standard and enforceable in most states when stated in your contract. State the fee schedule on every invoice so clients see it before the due date, not after.

More Free Templates for Contractors

CONSTRUCTION BID
Cornerstone Builders
Site prep + demolition$12,000
Framing + rough-in$48,000
Materials allowance$35,000
BID TOTAL$142,800

Construction Bid Template

Competitive bid template with scope, exclusions, alternates, and commercial terms built in.

Download Free Template →

GENERAL ESTIMATE
Foundation General Contracting
Project scope of work$24,000
Materials + permits$18,500
Labor (4-person crew)$16,800
TOTAL$62,300

General Contractor Estimate

All-purpose contractor estimate for remodels, additions, and multi-trade projects.

Download Free Template →

ROOFING ESTIMATE
Johnson Roofing Co.
Tear-off existing shingles (30 sq)$2,400
GAF Timberline HDZ shingles$4,200
Labor (3-person crew, 2 days)$3,600
TOTAL$15,940

Roofing Estimate Template

Asphalt shingles, metal, flat roofs with tear-off, materials, labor, and warranty line items built in.

Download Free Template →

Ready to save hours on every estimate?

SimplyWise turns a photo into a professional estimate in 6 seconds.

Try SimplyWise Free →