Free Roofing Estimate Template | Download PDF, Excel, Sheets

Templates  >  Roofing  >  Estimate Template

Free Roofing Estimate
Template

Professional estimate template used by 50,000+ contractors. Download instantly in PDF, Excel, or Google Sheets. Fill it out in under 3 minutes.

No signup required. Just download and start estimating.

Downloaded 12,000+ times

ROOFING ESTIMATE
Johnson Roofing Co.
Client: Mike & Sarah Thompson
742 Oak Lane, Houston, TX 77002
Date: April 15, 2026  |  Valid for 30 days
Tear-off existing shingles (30 sq)$2,400
GAF Timberline HDZ shingles (30 sq)$4,200
Underlayment + ice & water shield$1,100
Flashing, drip edge, ridge vent$850
Labor (3-person crew, 2 days)$3,600
Disposal + dumpster rental$475
TOTAL
$15,940

Trusted by 50,000+ contractors
⭐ 4.8 Stars
📱 App Store
📱 Google Play
🏆 #1 Estimating App

What Every Roofing Estimate Should Include

Company name, license number, and contact info
Client name and project address
Detailed scope of work (tear-off, install, repairs)
Materials list with quantities and unit costs
Labor hours and crew size with daily rates
Equipment rental (dumpster, scaffolding, safety gear)
Markup and profit margin (typically 15-25%)
Subtotal, tax, and grand total
Payment schedule (deposit, progress, final)
Estimate validity period (30-60 days)
Terms, warranty, insurance, and permits
Signature line for client approval

How to Write a Roofing Estimate in 5 Steps

1

Step 1: Assess the Job Site

Walk the property before quoting. Measure the roof area in squares (1 square = 100 sq ft), check for existing damage, note the pitch, and count penetrations (vents, skylights, chimneys). Take photos of everything.

2

Step 2: Itemize Materials and Quantities

List every material with quantities and unit costs. For roofing: shingles (by square), underlayment (by roll), ice and water shield, drip edge, flashing, ridge cap, ridge vent, nails, and sealant. Use supplier pricing as your baseline.

3

Step 3: Calculate Labor Costs

Estimate crew size and days. A typical 30-square re-roof takes a 3-person crew 2 days. Factor in tear-off time, complexity (steep pitch, multiple layers), and local labor rates ($45-75/hr depending on your market).

4

Step 4: Add Your Markup

Apply your markup (15-25% is standard for roofing). This covers overhead, insurance, warranty reserves, and profit. A 20% margin on a $12,000 job is $2,400 in profit. Don’t underbid to win the job.

5

Step 5: Send It and Follow Up

Export a clean PDF and send it within 24 hours of the site visit. Include a cover note summarizing the scope. Follow up within 48 hours if you don’t hear back. Speed wins jobs.

Average Roofing Job Costs to Guide Your Estimates

Use these benchmarks as starting points. Actual costs vary by region, materials, and job complexity.

Job Type Material Cost Labor Cost Total Range
Asphalt shingle re-roof (30 sq) $3,600 – $5,400 $3,000 – $4,500 $8,000 – $14,000
Flat roof (EPDM, 20 sq) $2,000 – $3,200 $2,400 – $3,600 $5,500 – $9,000
Metal roof install (30 sq) $6,000 – $12,000 $4,500 – $7,500 $14,000 – $25,000
Roof repair (leak/patch) $100 – $500 $200 – $600 $350 – $1,200
Gutter install (200 lf) $600 – $1,200 $400 – $800 $1,200 – $2,400
Skylight install $500 – $1,500 $800 – $1,500 $1,500 – $3,500

Costs vary by region. Get a location-specific estimate in 6 seconds with SimplyWise AI Estimator →

Estimating Best Practices for Roofing Contractors

1

Use Good-Better-Best pricing

Offer 3 tiers: basic (architectural shingles), mid (designer), premium (metal/slate). Clients close faster with options.

2

Include a payment schedule

Never ask for 100% upfront. Standard: 40% deposit, 30% at tear-off, 30% at walkthrough.

3

Build in contingency (10-15%)

Hidden damage, rotten decking, unexpected flashing work. Budget for it.

4

Always walk the job first

Satellite measurements are a starting point, not a final answer.

5

Speed wins more than price

Send a professional estimate within 24 hours. Responsiveness signals reliability.

6

Quote per project, not per hour

Fixed-price builds confidence. Per-hour pricing creates anxiety.

Estimate Template vs. Estimating Software

Free Template

Free

  • ✓ Pre-filled line items
  • ✓ PDF, Excel, Google Sheets
  • ✓ Print or email to clients
  • ✓ Manual updates required
  • ✓ No cost database
Free to Try

SimplyWise App

  • ✓ Photo-to-estimate in 6 seconds
  • ✓ Live material pricing by ZIP code
  • ✓ Professional PDF estimates + invoices
  • ✓ Send directly to clients
  • ✓ Track all your estimates

Try SimplyWise Free →

Frequently Asked Questions

What’s the difference between an estimate and a quote?
An estimate is an approximation of costs based on your initial assessment. A quote is a fixed price you commit to. Most roofing contractors start with an estimate after a site visit, then convert it to a firm quote once the scope is finalized.
How many pages should a roofing estimate be?
One to two pages is ideal. The first page covers scope, materials, labor, and total. The second page (optional) covers terms, warranty, and payment schedule.
Should I charge for roofing estimates?
Most residential roofers offer free estimates. For complex commercial jobs, charging $100-$250 for a detailed assessment is reasonable. Deduct it from the project if they hire you.
What file formats can I download this template in?
PDF (for sending to clients), Excel (for editing and calculations), and Google Sheets (for cloud-based collaboration). All three are free to download.
Is this template really free?
Yes, completely free. No sign-up, no email gate, no strings. We built these because contractors asked for them.

More Free Templates for Contractors

PAINTING ESTIMATE
Premier Painting Co.
Interior walls (1,200 sq ft)$1,440
Primer + 2 coats latex$960
Labor (2-person crew)$3,200
TOTAL$7,450

Painting Estimate Template

Interior and exterior painting with sq ft calculator, prep work line items, and regional paint pricing.

Download Free Template →

HVAC ESTIMATE
Summit HVAC Services
Carrier 3-ton AC (16 SEER2)$3,800
Furnace (80K BTU, 96%)$2,900
Labor (2-person crew)$3,200
TOTAL$15,655

HVAC Estimate Template

Heating and cooling system installs with equipment specs, ductwork, and seasonal labor adjustments.

Download Free Template →

CONTRACTOR INVOICE
Apex Construction LLC
Phase 1: Foundation$18,500
Phase 2: Framing$32,000
Materials + fixtures$22,000
BALANCE DUE$96,451

Contractor Invoice Template

Professional invoice template with progress billing, retainage tracking, and change order support.

Download Free Template →

Ready to save hours on every estimate?

SimplyWise turns a photo into a professional estimate in 6 seconds.

Try SimplyWise Free →

© 2026 SimplyWise. All rights reserved.