Construction Invoice Example (3 Filled-In Samples)

Blog  >  Free Templates  >  Construction Invoice Example

Construction Invoice Example (3 Filled-In Samples)

A construction invoice example shows you what to bill and how the math works. Below are three filled-in samples: lump sum, progress billing with retainage, and time and materials. Download all three as Excel, PDF and CSV, then copy the layout that fits your job.

Updated November 23, 2026  |  7 min read

All three worked examples

No signup required. Every name and number is made up.

Add SimplyWise as a preferred source

INVOICE #1042
Ridgeline Build Co.
Billed to: Marcus Hale, 214 Alder Court. Job: backyard deck rebuild. Issued November 23, 2026. Due on receipt.
Deck rebuild, per contract$8,400.00
Less deposit received$2,520.00
BALANCE DUE
$5,880.00
Sample layout. Not a market price.

⭐ 4.8 rating on the App Store (checked November 23, 2026)
📱 Built for contractors

What Should a Construction Invoice Include?

Construction site with a small site office building and a dumper
Photo: Stanley Howe, CC BY-SA 2.0, via Wikimedia Commons

A good invoice is one page and answers one question. How much do I owe, and by when? Every line below earns its place, so the client can pay without a phone call.

The IRS says you may choose any recordkeeping system suited to your business that clearly shows your income and expenses. Your invoice is part of that record, so keep it clean.

Invoice field What goes in it
Your business block Name, address, phone, and email.
Client and job Client name and the job site address.
Invoice number and dates A unique number, the issue date, and the due date.
Contract reference The contract sum and the date it was signed.
Line items Description, quantity, rate, and amount for each line.
Adjustments Deposits received, retainage held, and credits.
Amount due One bold number at the bottom.
Terms and payment methods When it is due, and how to pay you.

Want the blank version? Use the contractor invoice template, or read how to write a contractor invoice.

Pricing the job first? Turn a photo into an itemized estimate in about 6 seconds with SimplyWise Cost Estimator →. It is free to try.

Example 1: Lump Sum Construction Invoice

Use this when the contract has one fixed price. This sample bills a $5,880.00 balance.

Ridgeline Build Co. rebuilt a backyard deck for $8,400.00. The client paid a 30 percent deposit at signing.

Line How it is figured Amount
Deck rebuild, per contract 1 job at the contract price $8,400.00
Less deposit received 30 percent x $8,400.00 $2,520.00
Balance due on completion $8,400.00 minus $2,520.00 $5,880.00

Example only. The deposit shows as a credit, so the client sees the whole contract and what is left.

Need to chase an unpaid one? Read our guide to outstanding invoices.

Example 2: Progress Billing Invoice With Retainage

Use this on longer jobs, where you bill in draws as work finishes. This sample bills $12,960.00 for draw 3.

Ridgeline Build Co. has a $48,000.00 kitchen addition. The draws are 20, 30, 30, and 20 percent. Draw 3 covers rough-in complete.

Line How it is figured Amount
Contract sum As signed $48,000.00
Draw 3, rough-in complete 30 percent x $48,000.00 $14,400.00
Less retainage held 10 percent x $14,400.00 $1,440.00
Amount due this invoice $14,400.00 minus $1,440.00 $12,960.00
Billed to date $9,600.00 + $14,400.00 + $14,400.00 $38,400.00
Contract left to bill $48,000.00 minus $38,400.00 $9,600.00

Example only. Retainage is a field, not a rule.

Your contract sets whether you hold any, at what rate, and when it is released. Show it on its own line so nobody asks why the check is short.

Example 3: Time and Materials Invoice

Use this when the scope is not fixed. You bill hours and materials as they happen. This sample bills $2,533.88.

Ridgeline Build Co. repaired a storm-damaged fence and gate. The rates below are examples, not market rates or wages.

Line How it is figured Amount
Lead carpenter labor 12 hours x $85.00 $1,020.00
Helper labor 12 hours x $55.00 $660.00
Materials at cost Receipts attached $742.50
Materials markup 15 percent x $742.50, rounded to the cent $111.38
Total due $1,020.00 + $660.00 + $742.50 + $111.38 $2,533.88

Example only. Attach the receipts and a daily hours log. A field work order helps here, so see our work order template.

Pricing the next repair? Try SimplyWise Cost Estimator free →.

Which Construction Invoice Type Fits Your Job

Pick by how sure you are of the scope and how long the job runs.

Type Best when Watch for
Lump sum Short job, fixed scope. Cash sits with you until the end.
Progress billing Long job with clear milestones. Tie each draw to finished work.
Time and materials Open scope, repairs, surprises. Keep hours and receipts for every line.

Billing many jobs at once? Compare tools in our list of construction billing software and the best construction invoice software.

Payment Terms to Use on a Construction Invoice

Set terms in your contract first, then repeat them on every invoice. Short terms beat long ones.

Three common choices are due on receipt, net 15, and net 30. Net 30 means payment is due 30 days after the invoice date.

Add how to pay you: check, bank transfer, or a payment app handle. State the due date as a calendar date, not just a number of days. This page is not legal advice, so ask your attorney about late fees and lien rights in your state.

Mistakes That Delay Payment

1

No invoice number

Accounts payable cannot file it. Give every invoice its own number.

2

One lump total, no lines

Clients question what they cannot see. Show the lines.

3

Hidden retainage or deposit

A short check starts an argument. Show every credit on its own line.

4

A vague due date

Write “Due December 8, 2026”, not only “net 15”.

5

Billing late

Send the invoice the day the milestone is met, while the work is fresh.

6

No job address or contract link

Say which job and which contract the invoice belongs to.

Fix the front end too. A clear scope and a signed quote head off billing fights.

Build the estimate in SimplyWise Cost Estimator →. It is free to try.

What Is Actually in the Files Above

The Excel, PDF and CSV versions carry the same three worked examples. Each file holds one invoice header section, one line items section, and one terms section. Every row shown above is in the table.

Invoice header

Business name, client name, job address, invoice number, issue date, due date, and contract sum.

Line items

The table has seven columns: example, line, quantity, unit, rate, amount, and note. It holds the lump sum, progress billing, and time and materials rows.

Totals and terms

Deposit received, retainage held, amount due, payment terms, and payment methods. There is no card number field. Not legal advice.

The Free Examples vs. Running It in the App

Examples download

No cost

  • Three filled-in invoices to copy from.
  • Excel, PDF and CSV versions.
  • You type your own names and numbers.
  • Use the blank template for a fresh invoice.
Free to Try

SimplyWise App

  • Photo into an itemized estimate in about 6 seconds.
  • Turn a saved estimate into a professional, branded quote.
  • The client signs to approve the quote.
  • Invoicing is built into Cost Estimator.
  • $29.99 a month or $239.99 a year (about $20 a month on annual), with a 7-day free trial.

Try SimplyWise Cost Estimator free →

Frequently Asked Questions

The invoice itself

What does a construction invoice look like?
It is a one-page bill. It shows your business block, the client and job address, an invoice number, dates, line items, any deposit or retainage, one amount due, and payment terms.
What is a construction invoice?
It is the bill a contractor sends for work done. It lists the lines, any deposit or retainage, and one amount due.
How do I send an invoice as a contractor?
Send it by email, or hand it over, the day the milestone is met. Write the due date as a calendar date and list how to pay you.
What is progress billing on a construction invoice?
You bill in draws as work reaches milestones, each as a percent of the contract. Show billed to date and contract left, so both sides see where the job stands.
What payment terms should I put on a construction invoice?
Match your contract. Due on receipt, net 15, and net 30 are common. Write the actual due date, and ask your attorney about late fees.

Records and tools

How long should I keep construction invoices?
The IRS says to keep records as long as needed to prove the income or deductions on a tax return. Payroll is separate: keep employment tax records for at least four years.
Can I price a job from a photo before I invoice it?
Yes. SimplyWise Cost Estimator turns a photo into an itemized estimate in about 6 seconds, and it is free to try.

Keep Reading: More Free Templates for Contractors

Contractor Invoice Template

The blank version of these examples.

Open the template →

Construction Proposal Template

Win the job before you bill it.

Open the template →

Construction Bid Template

The fixed price your invoice bills against.

Open the template →

Estimate to Invoice App

Move from quote to bill without retyping.

Read the guide →

A note on the numbers on this page

Ridgeline Build Co., its clients, and every amount are made up. Each total follows by arithmetic from the inputs shown. None is a market price.

Sources

Government source, read November 23, 2026

  • Internal Revenue Service, Recordkeeping: irs.gov/businesses/small-businesses-self-employed/recordkeeping

SimplyWise product facts

  • SimplyWise Cost Estimator listing, App Store, checked November 23, 2026.

Ready to price the job before you invoice it?

SimplyWise turns a photo into an itemized estimate in about 6 seconds. Free to try, then $29.99 a month or $239.99 a year.

Try SimplyWise Cost Estimator free →

© 2026 SimplyWise. All rights reserved.