How to Estimate a Bathroom Remodel: Contractor Guide

How to Estimate · Bathroom Remodel

How to Estimate a Bathroom Remodel: Contractor Guide

Here is how to estimate a bathroom remodel without losing money: list every line first, price labor from real wages, then add a stated contingency.

Try SimplyWise Cost Estimator freeFree to try. Turn a photo into an itemized estimate in about 6 seconds.
★★★★★ 4.8 rating on the App Store (checked November 23, 2026)
SimplyWise

Updated November 23, 2026

5 min read

Add SimplyWise as a preferred source

Remodeled bathroom with hexagon floor tile, a dark vanity and a toilet
Photo: TLMWork, CC BY-SA 4.0, via Wikimedia Commons

What goes into a bathroom remodel estimate?

Split the job into demo, rough plumbing and electrical, framing, waterproofing, tile, fixtures and finish. Homeowners want one number, but you build it from lines.

For homeowner price ranges, read our bathroom remodel cost guide. This guide is for the contractor writing the bid.

Line What to list
Demo and haul-off Fixtures, tile, drywall, debris, dumpster
Rough plumbing Supply, drain, vent and valve changes
Rough electrical Outlets, fan, lighting, circuits
Waterproofing Shower pan, walls, seams, curb
Tile and grout Floor and wall square feet, trim
Fixtures Toilet, vanity, faucet, shower, tub

Mark client-chosen fixtures as allowances. An allowance is a set dollar limit, in writing, for an item the client has not picked yet. Copy this table as your bathroom remodel estimate template.

How do you price tile and waterproofing?

Tile is often the biggest labor line in a bathroom. Measure floor and wall square feet separately. List waterproofing as its own line so it never gets cut when the price gets tight.

Price tile by hours. The BLS median wage for tile and stone setters is $26.77 an hour (BLS OEWS, May 2025). That is an employee wage before payroll costs, not a self-employed rate.

See how to estimate tile installation and bathroom tile installation cost for more.

Cutting stone makes silica dust. OSHA says applying water to a saw blade “substantially reduces the amount of dust created” when cutting stone and other materials that contain crystalline silica. Price a wet saw or dust control into the line.

Turn a bathroom photo into an itemized estimate, free →

What do plumbing and electrical subs add?

Decide who does each trade before you bid. For your own crew, use hours times wage. For a sub, use the written quote and add your markup.

Our guides to estimating a plumbing job and electrical work go deeper.

Example: 44 crew hours at BLS median wages come to $1,251.72 before payroll costs.

Trade Median hourly wage Example hours Example wages
Tile and stone setters $26.77 20 $535.40
Plumbers $30.67 8 $245.36
Electricians $30.38 4 $121.52
Carpenters $29.12 12 $349.44
Total 44 $1,251.72

Example only: the hours are invented to show the arithmetic. The totals are wages before payroll costs, not a market price. BLS OEWS covers employees, not self-employed contractors.

Does the home need lead-safe work or special fixtures?

EPA’s RRP rule requires anyone paid to disturb painted surfaces in a home built before 1978 to be certified in lead-safe work practices. EPA says that includes all firms, even sole proprietorships. Ask the year built on the first call and price lead-safe steps before demo, not after.

Fixtures change line items too. EPA WaterSense labeled toilets use 1.28 gallons per flush or less, showerheads no more than 2.0 gallons per minute (gpm), and faucets 1.5 gpm at most. Price a swap with our toilet installation cost or bathtub replacement cost guide.

How much contingency should you add?

Contingency is a separate written line that covers surprises found after demo. There is no single right percentage. Pick yours from your own past bathrooms and state it in writing.

Tie it to what you cannot see: rot behind the tub, old pipes, a soft floor. If you do not use it, tell the client.

How do you present options?

Offer good, better and best on what the client chooses: vanity, tile, fixtures and glass. Keep the scope the same and show one total per tier. Put allowances, exclusions and the start date on the page.

Compare tools in our best estimating apps for bathroom remodelers list.

Say who buys the materials, because a client-bought vanity can change your plumbing and hours. Label the bid an estimate or a fixed-price quote.

How to estimate a bathroom remodel in four steps

  1. Walk and photograph the room.

    Measure floor, walls and shower. Ask the year built.

  2. List every line.

    Use the table above, one line per trade or material.

  3. Price labor and materials.

    Hours times wage, plus payroll costs, material lines and written sub quotes.

  4. Add contingency and options.

    Show contingency as its own line, then offer tiers.

Bathroom remodel estimate tool: SimplyWise Cost Estimator

SimplyWise Cost Estimator turns a job-site photo into an itemized estimate in about 6 seconds. It builds material, labor and fee lines, each with unit, quantity and price per unit. Every line stays editable.

Send a branded quote the client signs to approve. Room scan works on Pro iPhones that have LiDAR. It costs $29.99 a month or $239.99 a year (about $20 a month on annual), with a 7-day free trial.

Try SimplyWise Cost Estimator free

Keep reading

Sources

Wages

Lead and dust rules

Fixtures

Frequently asked questions about how to estimate a bathroom remodel

What does a bathroom remodel estimate include?

Demo and haul-off, rough plumbing and electrical, waterproofing, tile and grout, fixtures, paint and trim, plus a written contingency line. Mark client-chosen items as allowances.

Do I need lead-safe certification for a bathroom remodel?

If you are paid to disturb painted surfaces in a home built before 1978, EPA’s RRP rule requires lead-safe certification, even for sole proprietorships. Check your state program.

How do I price tile and waterproofing?

Measure floor and wall square feet, price hours at a real wage, and keep waterproofing as its own line. The BLS median for tile and stone setters is $26.77 an hour before payroll costs.

Can I quote a bathroom from a photo?

Yes. SimplyWise Cost Estimator turns a job-site photo into an itemized estimate in about 6 seconds. Measure the room for exact quantities, and every line stays editable.

How to estimate a bathroom remodel

Bid the bathroom with every line on the page.