# Construction Invoice Example (3 Filled-In Samples) Canonical URL: https://www.simplywise.com/blog/construction-invoice-example/ Plain text: https://www.simplywise.com/blog/construction-invoice-example/llms.txt Publisher: SimplyWise, Inc. (https://www.simplywise.com) Published: November 23, 2026 Updated: November 23, 2026 Category: Free Templates Summary: Construction invoice example in three filled-in versions: lump sum, progress billing with retainage, and time and materials. Excel, PDF and CSV. --- Log in (https://simplywise.com/login) Blog (https://www.simplywise.com/blog/) > Free Templates (https://www.simplywise.com/blog/category/free-templates/) > Construction Invoice Example ## Construction Invoice Example (3 Filled-In Samples) A construction invoice example shows you what to bill and how the math works. Below are three filled-in samples: lump sum, progress billing with retainage, and time and materials. Download all three as Excel, PDF and CSV, then copy the layout that fits your job. Updated November 23, 2026 | 7 min read All three worked examples πŸ“„ PDF (https://www.simplywise.com/blog/wp-content/uploads/2026/11/simplywise-construction-invoice-example.pdf) Excel (https://www.simplywise.com/blog/wp-content/uploads/2026/11/simplywise-construction-invoice-example.xlsx) CSV (https://www.simplywise.com/blog/wp-content/uploads/2026/11/simplywise-construction-invoice-example.csv) No signup required. Every name and number is made up. Add SimplyWise as a preferred source (https://www.google.com/preferences/source?q=simplywise.com) INVOICE #1042 Ridgeline Build Co. Billed to: Marcus Hale, 214 Alder Court. Job: backyard deck rebuild. Issued November 23, 2026. Due on receipt. Deck rebuild, per contract $8,400.00 Less deposit received $2,520.00 BALANCE DUE $5,880.00 Sample layout. Not a market price. ⭐ 4.8 rating on the App Store (checked November 23, 2026) πŸ“± Built for contractors ## What Should a Construction Invoice Include? A good invoice is one page and answers one question. How much do I owe, and by when? Every line below earns its place, so the client can pay without a phone call. The IRS says you may choose any recordkeeping system suited to your business that clearly shows your income and expenses. Your invoice is part of that record, so keep it clean. | Invoice field | What goes in it | | --- | --- | | Your business block | Name, address, phone, and email. | | Client and job | Client name and the job site address. | | Invoice number and dates | A unique number, the issue date, and the due date. | | Contract reference | The contract sum and the date it was signed. | | Line items | Description, quantity, rate, and amount for each line. | | Adjustments | Deposits received, retainage held, and credits. | | Amount due | One bold number at the bottom. | | Terms and payment methods | When it is due, and how to pay you. | Want the blank version? Use the contractor invoice template (https://www.simplywise.com/blog/contractor-invoice-template/), or read how to write a contractor invoice (https://www.simplywise.com/blog/how-to-write-a-contractor-invoice/). Pricing the job first? Turn a photo into an itemized estimate in about 6 seconds with SimplyWise Cost Estimator β†’. It is free to try. ## Example 1: Lump Sum Construction Invoice Use this when the contract has one fixed price. This sample bills a $5,880.00 balance. Ridgeline Build Co. rebuilt a backyard deck for $8,400.00. The client paid a 30 percent deposit at signing. | Line | How it is figured | Amount | | --- | --- | --- | | Deck rebuild, per contract | 1 job at the contract price | $8,400.00 | | Less deposit received | 30 percent x $8,400.00 | $2,520.00 | | Balance due on completion | $8,400.00 minus $2,520.00 | $5,880.00 | Example only. The deposit shows as a credit, so the client sees the whole contract and what is left. Need to chase an unpaid one? Read our guide to outstanding invoices (https://www.simplywise.com/blog/outstanding-invoices/). ## Example 2: Progress Billing Invoice With Retainage Use this on longer jobs, where you bill in draws as work finishes. This sample bills $12,960.00 for draw 3. Ridgeline Build Co. has a $48,000.00 kitchen addition. The draws are 20, 30, 30, and 20 percent. Draw 3 covers rough-in complete. | Line | How it is figured | Amount | | --- | --- | --- | | Contract sum | As signed | $48,000.00 | | Draw 3, rough-in complete | 30 percent x $48,000.00 | $14,400.00 | | Less retainage held | 10 percent x $14,400.00 | $1,440.00 | | Amount due this invoice | $14,400.00 minus $1,440.00 | $12,960.00 | | Billed to date | $9,600.00 + $14,400.00 + $14,400.00 | $38,400.00 | | Contract left to bill | $48,000.00 minus $38,400.00 | $9,600.00 | Example only. Retainage is a field, not a rule. Your contract sets whether you hold any, at what rate, and when it is released. Show it on its own line so nobody asks why the check is short. ## Example 3: Time and Materials Invoice Use this when the scope is not fixed. You bill hours and materials as they happen. This sample bills $2,533.88. Ridgeline Build Co. repaired a storm-damaged fence and gate. The rates below are examples, not market rates or wages. | Line | How it is figured | Amount | | --- | --- | --- | | Lead carpenter labor | 12 hours x $85.00 | $1,020.00 | | Helper labor | 12 hours x $55.00 | $660.00 | | Materials at cost | Receipts attached | $742.50 | | Materials markup | 15 percent x $742.50, rounded to the cent | $111.38 | | Total due | $1,020.00 + $660.00 + $742.50 + $111.38 | $2,533.88 | Example only. Attach the receipts and a daily hours log. A field work order helps here, so see our work order template (https://www.simplywise.com/blog/work-order-template/). Pricing the next repair? Try SimplyWise Cost Estimator free β†’. ## Which Construction Invoice Type Fits Your Job Pick by how sure you are of the scope and how long the job runs. | Type | Best when | Watch for | | --- | --- | --- | | Lump sum | Short job, fixed scope. | Cash sits with you until the end. | | Progress billing | Long job with clear milestones. | Tie each draw to finished work. | | Time and materials | Open scope, repairs, surprises. | Keep hours and receipts for every line. | Billing many jobs at once? Compare tools in our list of construction billing software (https://www.simplywise.com/blog/construction-billing-software/) and the best construction invoice software (https://www.simplywise.com/blog/best-construction-invoice-software/). ## Payment Terms to Use on a Construction Invoice Set terms in your contract first, then repeat them on every invoice. Short terms beat long ones. Three common choices are due on receipt, net 15, and net 30. Net 30 means payment is due 30 days after the invoice date. Add how to pay you: check, bank transfer, or a payment app handle. State the due date as a calendar date, not just a number of days. This page is not legal advice, so ask your attorney about late fees and lien rights in your state. ## Mistakes That Delay Payment ### No invoice number Accounts payable cannot file it. Give every invoice its own number. ### One lump total, no lines Clients question what they cannot see. Show the lines. ### Hidden retainage or deposit A short check starts an argument. Show every credit on its own line. ### A vague due date Write β€œDue December 8, 2026”, not only β€œnet 15”. ### Billing late Send the invoice the day the milestone is met, while the work is fresh. ### No job address or contract link Say which job and which contract the invoice belongs to. Fix the front end too. A clear scope and a signed quote head off billing fights. Build the estimate in SimplyWise Cost Estimator β†’. It is free to try. ## What Is Actually in the Files Above The Excel, PDF and CSV versions carry the same three worked examples. Each file holds one invoice header section, one line items section, and one terms section. Every row shown above is in the table. ### Invoice header Business name, client name, job address, invoice number, issue date, due date, and contract sum. ### Line items The table has seven columns: example, line, quantity, unit, rate, amount, and note. It holds the lump sum, progress billing, and time and materials rows. ### Totals and terms Deposit received, retainage held, amount due, payment terms, and payment methods. There is no card number field. Not legal advice. ## The Free Examples vs. Running It in the App Examples download ### No cost - Three filled-in invoices to copy from. - Excel, PDF and CSV versions. - You type your own names and numbers. - Use the blank template for a fresh invoice. Free to Try ### SimplyWise App - Photo into an itemized estimate in about 6 seconds. - Turn a saved estimate into a professional, branded quote. - The client signs to approve the quote. - Invoicing is built into Cost Estimator. - $29.99 a month or $239.99 a year (about $20 a month on annual), with a 7-day free trial. ## Frequently Asked Questions ### The invoice itself What does a construction invoice look like? What is a construction invoice? How do I send an invoice as a contractor? What is progress billing on a construction invoice? What payment terms should I put on a construction invoice? ### Records and tools How long should I keep construction invoices? Can I price a job from a photo before I invoice it? ## Keep Reading: More Free Templates for Contractors ### Contractor Invoice Template The blank version of these examples. Open the template β†’ (https://www.simplywise.com/blog/contractor-invoice-template/) ### Construction Proposal Template Win the job before you bill it. Open the template β†’ (https://www.simplywise.com/blog/construction-proposal-template/) ### Construction Bid Template The fixed price your invoice bills against. Open the template β†’ (https://www.simplywise.com/blog/construction-bid-template/) ### Estimate to Invoice App Move from quote to bill without retyping. Read the guide β†’ (https://www.simplywise.com/blog/estimate-to-invoice-app/) ### A note on the numbers on this page Ridgeline Build Co., its clients, and every amount are made up. Each total follows by arithmetic from the inputs shown. None is a market price. ## Sources ### Government source, read November 23, 2026 - Internal Revenue Service, Recordkeeping: irs.gov/businesses/small-businesses-self-employed/recordkeeping ### SimplyWise product facts - SimplyWise Cost Estimator listing, App Store, checked November 23, 2026. ## Ready to price the job before you invoice it? SimplyWise turns a photo into an itemized estimate in about 6 seconds. Free to try, then $29.99 a month or $239.99 a year. SimplyWise Templates Blog Privacy (https://simplywise.com/privacy) Terms (https://simplywise.com/terms) Smart tools for contractors - Log in (https://simplywise.com/login) - New Business Program (https://www.simplywise.com/#program) - About (https://www.simplywise.com/about) - Support (https://www.simplywise.com/support) - Privacy (https://www.simplywise.com/privacy) - Terms (https://www.simplywise.com/terms) - Blog (https://www.simplywise.com/blog/) --- ## About SimplyWise SimplyWise, Inc. (New York, NY) builds mobile apps for contractors, tradespeople, and small business owners. The SimplyWise Cost Estimator turns a job site photo into an itemized estimate with labor and material costs in about 6 seconds, and the client signs the branded quote to approve it. It is rated 4.8 on the App Store. It is free to try with a 7-day free trial, then $29.99 per month or $239.99 per year (about $20 per month on the annual plan), and one subscription includes every app in the SimplyWise suite. - Download: https://www.simplywise.com/download - App Store: https://apps.apple.com/us/app/simplywise-cost-estimator/id6670619664 - Google Play: https://play.google.com/store/apps/details?id=com.simplywise.costestimator - Every SimplyWise page as plain text: https://www.simplywise.com/blog/llms.txt