# Free Concrete Estimate Template (PDF + Excel) for 2026 Canonical URL: https://www.simplywise.com/blog/concrete-estimate-template/ Plain text: https://www.simplywise.com/blog/concrete-estimate-template/llms.txt Publisher: SimplyWise, Inc. (https://www.simplywise.com) Published: May 25, 2026 Updated: October 27, 2026 Category: Free Templates Summary: Free concrete estimate template for contractors. Material, labor, cubic yard math, markup built in. Download as PDF, Excel, or Google Sheets. --- Log in (https://simplywise.com/login) Templates > Concrete > Estimate Template ## Free Concrete Estimate Template A contractor-ready concrete estimate template with material, labor, cubic yards, and markup built in. Then download it instantly in PDF, Excel, or Google Sheets. Finally, fill it out in under 5 minutes. Download PDF Excel Google Sheets No signup required. Just download and start estimating. Trusted by thousands of concrete contractors Add SimplyWise as a preferred source (https://www.google.com/preferences/source?q=simplywise.com) CONCRETE ESTIMATE Apex Concrete LLC Client: Mark and Sara Lin 2204 Cottonwood Dr, Phoenix, AZ 85048 Date: April 24, 2026 | Valid for 30 days Demo and haul existing slab (200 sf) $640 Excavate, grade, 4-inch gravel base $820 Forms, #4 rebar grid, vapor barrier $540 Ready-mix 4000 psi (8 cubic yards) $1,440 Labor (3-person crew, 1 day) $1,680 Saw-cut joints, broom finish, cure $280 Permit and inspection $185 TOTAL $5,585 Trusted by thousands of contractors 4.8 Stars App Store Google Play #1 Estimating App ## What Every Concrete Estimate Should Include Also, a clean concrete estimate template covers the full pour cycle, from subgrade prep to saw-cut joints. Notably, skipping any of the line items below is how concrete contractors leak margin on jobs that should have been profitable. ### Required line items on every concrete estimate ✓ Company name, license number, insurance, and contact info ✓ Client name and full project address ✓ Scope of work (demo, prep, pour, finish, joints, cure) ✓ Slab dimensions, thickness, and total square footage ✓ Concrete strength (PSI), mix design, and slump spec ✓ Cubic yards ordered, plus a stated waste allowance ✓ Reinforcement (rebar size and spacing, wire mesh, or fiber) ✓ Base layer (gravel depth, vapor barrier if interior) ✓ Forms, snap ties, stakes, expansion joint material ✓ Labor (crew size, days on site, screed and float hours) ✓ Pump truck rental if access requires it ✓ Saw-cut control joints (priced per linear foot) ✓ Finish type (broom, smooth, exposed aggregate, stamped) ✓ Curing compound or wet-cure plan ✓ Permits, inspection, and chute washout disposal ✓ Markup (typically 15 to 25 percent on materials and labor) ✓ Subtotal, tax, and grand total ✓ Payment schedule (deposit, mid-pour, final) ✓ Estimate validity period (typically 30 days) ✓ Warranty terms and signature line ## How to Write a Concrete Estimate in 5 Steps First, use the concrete estimate template above as your line-item checklist. Then the five steps below walk through filling it out from the first site visit to the signed PDF the homeowner accepts. ### Step 1: Walk the Site and Assess Subgrade First, measure the slab dimensions, mark the elevation, and note truck access (most ready-mix trucks need a 12 ft path with overhead clearance). Then check soil type, look for tree roots, and verify drainage slope. In addition, photograph any existing concrete that needs demo. Notably, subgrade issues kill more concrete jobs than mix design ever will. As a result, document everything before you spec materials. ### Step 2: Spec the Mix and Reinforcement Specifically, list the PSI rating in writing. For example, sidewalks and patios run 3000 to 3500 psi, driveways and garage floors run 3500 to 4000 psi, residential foundations are 3000 psi minimum, and commercial slabs run 4000 to 5000 psi (per ACI 332 and ACI 318 (https://www.concrete.org/)). In addition, spec rebar size and spacing (typically #4 at 18 to 24 inches on center), wire mesh or fiber additive, and base layer thickness. As a result, putting it on paper protects you when the inspector shows up. ### Step 3: Calculate Cubic Yards and Labor Hours First, run the math: (length in feet) x (width in feet) x (thickness in feet) divided by 27 equals cubic yards. Then add 7 to 10 percent for waste, spillage, and uneven subgrade. Generally, standard ready-mix runs roughly $160 to $190 per cubic yard delivered in most U.S. markets, with short-load surcharges of $50 to $150 per yard short of a full truck. In addition, concrete labor (finishers plus helpers) runs $40 to $80 per crew-hour combined. For example, a typical 600 sq ft residential driveway pour is a one-day job for a 3-person crew. ### Step 4: Add Permits, Pump Truck, and Markup Generally, permits run $50 to $400 depending on the jurisdiction. However, if the truck cannot reach the pour, line pump rental runs $700 to $1,500 per day. In addition, saw-cut joints and curing compound are not free and need their own line items. Then apply your markup, typically 15 to 25 percent on materials and labor, with stamped or decorative work going higher (25 to 40 percent). As a result, bake every recurring cost into the template once and you will stop bleeding margin on the small stuff. ### Step 5: Send a Clean PDF and Follow Up Finally, export a branded PDF within 24 hours of the site walk. In particular, include a one-paragraph scope summary, the full line-item breakdown, the PSI and reinforcement spec, the payment schedule, validity period, and a signature line. As a result, homeowners who see a professional concrete estimate template instead of a number scribbled on a napkin sign faster, and they pay closer to the asking price. ## Average Concrete Job Costs to Guide Your Estimates Generally, these are national starting ranges to drop into your concrete estimate template. However, actual costs vary by region, mix design, access, and finish. As a result, use these as the floor of your estimate, then adjust up for site conditions. | Job Type | Material Cost | Labor Cost | Total Range | | --- | --- | --- | --- | | Concrete driveway, 600 sq ft (4-inch) | $1,400 to $2,400 | $1,000 to $2,200 | $2,400 to $5,400 | | Concrete patio, 200 sq ft (basic broom finish) | $500 to $900 | $700 to $1,500 | $1,200 to $2,400 | | Slab foundation, 1,200 sq ft | $3,200 to $5,800 | $2,800 to $6,200 | $6,000 to $12,000 | | Sidewalk, 100 lf x 4 ft x 4-inch | $900 to $1,600 | $1,100 to $2,400 | $2,000 to $4,000 | | Stamped patio, 200 sq ft (decorative) | $900 to $1,800 | $1,500 to $2,400 | $2,400 to $4,200 | | Concrete demo and removal, 200 sq ft | $100 to $250 | $300 to $950 | $400 to $1,200 | Costs vary by region, mix design, and access. Get a location-specific concrete estimate in seconds with the SimplyWise Cost Estimator → Concrete Strength Reference ## PSI Specs to Put on Every Estimate Notably, concrete strength is one of the few specs where a wrong number gets you sued. Therefore, always cite the PSI rating on your concrete estimate template, in writing, and align with the published code. Sidewalks and patios 3,000 to 3,500 psi Driveways and garage floors 3,500 to 4,000 psi Residential foundations and footings 3,000 psi minimum Commercial slabs and structural 4,000 to 5,000 psi Specs reference ACI 332 (residential concrete code) and ACI 318 (structural concrete code), published by the American Concrete Institute (https://www.concrete.org/). ## Cubic Yard Math: Don’t Order Short, Don’t Order Long Generally, ordering short means a second truck and a second short-load fee. Conversely, ordering long means money poured down the chute. In fact, the formula is the same one every concrete contractor learns on day one, but it shows up on the estimate template so the customer sees how the number was calculated. The formula (Length in ft) x (Width in ft) x (Thickness in ft) / 27 = cubic yards First, convert thickness to feet. For example, a 4-inch slab is 0.333 ft. Similarly, a 6-inch slab is 0.5 ft. Finally, add 7 to 10 percent for waste, spillage, and uneven subgrade. Worked example: 20 x 30 ft driveway, 4-inch thick - 20 x 30 x 0.333 = 199.8 cubic feet - 199.8 / 27 = 7.4 cubic yards - 7.4 + 10 percent waste = 8.14 cubic yards - Order 8 cubic yards (one full truck) Generally, a typical ready-mix truck holds 9 to 11 cubic yards, so 8 yards fits in a single delivery. However, if the math comes back at 9.5 yards, you order 10 and accept a touch of waste over a short-load fee that runs $50 to $150 per yard short. ## Estimating Best Practices for Concrete Contractors In summary, six rules that turn a good concrete estimate template into a profit-protecting bid every time. ### Always pull the permit. No exceptions. Notably, unpermitted slab work is a liability bomb. Specifically, it voids insurance, kills resale value, and puts your license at risk if anything cracks or settles. Therefore, build the permit cost into every estimate. In fact, clients who push back on permits are not clients you want. ### Photograph the subgrade before the pour First, document gravel base depth, vapor barrier, rebar grid, and form alignment before the truck arrives. As a result, photos protect you legally and prove the prep was done. In fact, concrete hides everything once it covers the steel, so the photo log is your warranty against future callbacks. ### Bid by cubic yard, not by job Generally, per-yard pricing is transparent, easy to compare, and lets clients add or remove scope without re-quoting the whole estimate. For example, if the homeowner decides to extend the patio another 4 feet, you add yards and labor without rebuilding the bid from scratch. ### Spec the rebar grid in writing Notably, rebar size and spacing is where shady contractors cut margin. By comparison, putting #4 at 24 inches on center on the estimate (versus #3 at 36 inches) makes you the obvious choice when the homeowner is comparing bids. In addition, it means the inspector signs off without asking questions. ### Bake in the pump truck cost Specifically, if access requires a pump (backyard pours, second-floor decks, anything more than 100 ft from the street), the line pump or boom pump is $700 to $1,500 per day. However, it is not a surprise charge. Therefore, walk the access on the site visit and decide before you send the estimate. ### Add saw-cut joints and curing as line items Generally, control joints get saw-cut at 24 to 36 times the slab thickness in inches (a 4-inch slab joints at 8 to 12 ft). Likewise, curing compound is not free either. Therefore, both belong on the estimate template as their own line items, not buried in labor. In fact, customers respect a contractor who shows the work. Industry Perspective As Concrete Decor Magazine (https://www.concretedecor.net/) contributor Chris Sullivan has noted across years of pricing-focused articles, most concrete contractors lose money not on the pour itself but on the line items they forgot to estimate. Specifically, short-load fees, weekend delivery surcharges, pump truck rental, saw-cutting joints, and curing compound add up fast. Build every recurring cost into the template once, and you stop bleeding margin on the small stuff. ## Common Mistakes a Concrete Estimate Template Fixes In fact, a concrete estimate template is only useful if it forces you to fill in the line items that contractors most often skip. Specifically, here are the mistakes the template is built to catch before they cost you money on the actual job. ### Forgetting the short-load fee Generally, most plants charge $50 to $150 per cubic yard short of a full truck. For example, if your bid called for 4 yards on a 10-yard truck, that surcharge alone can swing the job from profit to loss. As a result, the template line for “Ready-mix delivery” includes a sub-line for short-load surcharge so you cannot ship the estimate without addressing it. ### Underbidding subgrade prep Notably, excavation, gravel base, and grading are not optional and not free. For example, a 600 sq ft driveway needs roughly 7 cubic yards of compacted gravel base. As a result, the template forces you to itemize prep separately from the pour, so it does not get absorbed into “labor” and forgotten. ### Missing the saw-cut joints Generally, control joints saw-cut at 24 to 36 times slab thickness in inches. For example, a 4-inch slab needs joints every 8 to 12 ft. Conversely, skipping them means the slab cracks where it wants to, not where you want it to. Therefore, build the saw-cutting line into the template so it is never an afterthought. ### Pricing decorative work like flatwork In particular, stamped, colored, and exposed-aggregate finishes carry 25 to 40 percent markup, not the standard 15 to 25 percent. Specifically, they take longer, use specialty materials, and demand a more skilled crew. As a result, the template separates the finish line item so you can apply the right markup category instead of dropping it into a flat bid. ## Concrete Contracting in 2026, by the Numbers The market context behind every concrete estimate template you fill out this year. 200K cement masons and concrete finishers nationwide (BLS OEWS, 2023) 16K+ poured-concrete contractor businesses in the U.S. (Census CBP, NAICS 238110) $24/hr median wage for cement masons and finishers (BLS, May 2023) 15-25% industry-typical markup on materials and labor (NAHB, IBISWorld) Sources: BLS OEWS 47-2051 (https://www.bls.gov/oes/current/oes472051.htm), BLS Occupational Outlook Handbook (https://www.bls.gov/ooh/construction-and-extraction/cement-masons-and-concrete-finishers.htm), U.S. Census County Business Patterns (https://www.census.gov/programs-surveys/cbp.html). ## Concrete Estimate Template vs. Estimating Software Generally, the free template is a perfect starting point. However, the next step up is photo-to-estimate software that pulls live material pricing by ZIP code and exports a branded PDF in a single tap. Wondering which estimating app to pick for your trade? See our 10 best estimating apps for electricians ranking. Notably, the same 100-point rubric applies across concrete, roofing, plumbing, and HVAC; current pricing and free-trial details on every option. DIY Template ### Free - ✓ Pre-filled concrete line items - ✓ PDF, Excel, Google Sheets - ✓ Print or email to clients - ✓ Manual cubic yard math - ✓ No live material pricing Free to Try ### SimplyWise Cost Estimator $29.99/month. Free to try. - ✓ Photo-to-estimate in seconds - ✓ Live material pricing by ZIP code - ✓ Branded PDF estimates and invoices - ✓ Send straight to clients - ✓ Track every estimate in one place ## Frequently Asked Questions ### What is the difference between a concrete estimate and a quote? ### How many cubic yards of concrete do I need? ### Should concrete contractors charge for estimates? ### How do I price stamped or decorative concrete? ### What file formats can I download this concrete estimate template in? ### How is the SimplyWise Cost Estimator different from this free template? ### Do I need a permit for concrete work? ## More Free Templates for Contractors ELECTRICAL ESTIMATE Spark Electric LLC 200A panel upgrade $1,800 20 new circuits + breakers $1,200 Labor (electrician + apprentice) $4,200 TOTAL $10,921 ### Electrical Estimate Template Panel upgrades, rewires, and EV chargers with code-compliant line items. PLUMBING ESTIMATE Reliable Plumbing Co. Water heater install (50 gal) $1,850 Copper repipe (80 lf) $2,400 Labor (2-person crew) $2,800 TOTAL $8,950 ### Plumbing Estimate Template Fixture installs, repipes, water heaters, and leak repairs with code-compliant line items. GENERAL ESTIMATE Foundation General Contracting Project scope of work $24,000 Materials + permits $18,500 Labor (4-person crew) $16,800 TOTAL $62,300 ### General Contractor Estimate All-purpose contractor estimate for remodels, additions, and multi-trade projects. ## Ready to save hours on every concrete estimate? Finally, pair the free concrete estimate template above with the SimplyWise Cost Estimator. As a result, a site photo turns into a contractor-ready estimate in seconds. Of course, free to try. SimplyWise Templates Blog Privacy (https://simplywise.com/privacy) Terms (https://simplywise.com/terms) Smart tools for contractors - Log in (https://simplywise.com/login) - New Business Program (https://www.simplywise.com/#program) - About (https://www.simplywise.com/about) - Support (https://www.simplywise.com/support) - Privacy (https://www.simplywise.com/privacy) - Terms (https://www.simplywise.com/terms) - Blog (https://www.simplywise.com/blog/) --- ## About SimplyWise SimplyWise, Inc. (New York, NY) builds mobile apps for contractors, tradespeople, and small business owners. The SimplyWise Cost Estimator turns a job site photo into an itemized estimate with labor and material costs in about 6 seconds, and the client signs the branded quote to approve it. It is rated 4.8 on the App Store. It is free to try with a 7-day free trial, then $29.99 per month or $239.99 per year (about $20 per month on the annual plan), and one subscription includes every app in the SimplyWise suite. - Download: https://www.simplywise.com/download - App Store: https://apps.apple.com/us/app/simplywise-cost-estimator/id6670619664 - Google Play: https://play.google.com/store/apps/details?id=com.simplywise.costestimator - Every SimplyWise page as plain text: https://www.simplywise.com/blog/llms.txt