10 Ways Smart Contractors Protect Their Profit Margin in 2026



HomeBlog › Profit Margins

10 Ways Smart Contractors Protect Their Profit Margin in 2026

Material costs are volatile, labor is tight, and lowball competitors are everywhere. These are the margin protection strategies that separate contractors who thrive from those who just survive.

SimplyWise Team · April 9, 2026 · 18 min read



The Margin Problem Nobody Talks About

You finish a tough job. The client is happy, the crew did great work, and everything came together. Then you sit down to run the numbers. That 20% margin you priced in somehow became 6%. Where did it go?

If that sounds familiar, you are not alone. And it is not because you are bad at your trade. It is because the business side of contracting eats profit in ways most guys never see coming.

THE HARD TRUTH

The average general contractor nets just 3.9% to 6.1% profit. On a $500,000 project, that is $19,500 to $30,500 after all costs. One bad material estimate, one untracked change order, one week of weather delays, and that profit is gone.

The NAHB reports that remodeling contractors average 8% to 12% net. Specialty trades like electrical, plumbing, and HVAC often see 15-25% gross margins, but net profit after overhead rarely tops 10-12%.

The contractors pulling above-average margins are not necessarily better with a hammer. They are better at running a business. They estimate right, track every dollar, manage scope creep, and know which jobs to take and which to walk away from.

This guide covers the 10 strategies profitable contractors actually use. No theory, no fluff. Just practical systems and habits that keep money in your pocket.

Typical Profit Margins by Trade (2025-2026)

Trade / Contractor Type Gross Margin Range Typical Net Profit
General Contractor (New Construction) 15-22% 3.9-6.1%
Remodeling Contractor 25-35% 8-12%
Electrical 18-25% 8-12%
Plumbing 20-28% 10-15%
HVAC 18-25% 8-14%
Roofing 20-30% 6-12%
Painting 30-45% 10-18%
Landscaping / Hardscaping 25-35% 10-15%
Concrete / Masonry 20-30% 8-12%
Flooring 25-35% 10-15%

Sources: CFMA Annual Financial Survey 2024-2025, NAHB Cost of Doing Business Study, PHCC Contractor Profitability Benchmarks

Now let’s break down what the top earners in each trade do differently.



1. Get Your Estimates Right the First Time

Underestimating is the single biggest margin killer. Industry surveys consistently show that a majority of contractors complete at least one project per year below their target margin. The top cause? Bad initial estimates.

Underbid by just 5% and the math gets ugly fast. On a $50,000 bathroom remodel with a 20% target margin ($10,000 profit), a 5% miss means $2,500 comes straight out of your pocket. That is a 25% hit before you have picked up a single tool.

Where estimates go wrong

  • Eyeballing material quantities instead of doing detailed takeoffs. Missing 15 sheets of drywall on a gut renovation adds up fast.
  • Using outdated pricing. Lumber, copper, and concrete prices have fluctuated 10-30% year over year since 2022. A quote from six months ago is not a quote.
  • Forgetting the small stuff. Fasteners, adhesives, caulk, tape, blades, sandpaper, dumpster fees, permit costs, temporary utilities. These “minor” items routinely add 3-8% to total material costs.
  • Underestimating labor hours. The job always takes longer than you think. Demo surprises, material delays, weather, callbacks. Build in realistic labor buffers.

How to fix it

The most accurate estimators use a combination of detailed takeoffs, current supplier pricing (not memory pricing), and historical data from their own completed projects. If your last three kitchen remodels averaged $38/sq ft in materials, that is a more reliable number than any generic cost guide.

Tools like SimplyWise let you snap a photo of a project space and generate a detailed cost estimate in about 6 seconds. It pulls from current material pricing data, so you are working with real numbers, not last year’s prices. For contractors estimating 5-10 jobs per week, that speed and accuracy directly protects margin on every bid. For more ways to cut wasted time on the business side, check out 5 AI shortcuts every contractor should use.

MARGIN TIP

Keep a “post-mortem” spreadsheet for every completed job. Record your original estimate vs. actual costs. After 10-15 jobs, you will see exactly where your estimates consistently miss, and you can adjust your bidding accordingly.



2. Build a Material Cost Buffer Into Every Job

Even the best estimate is still an estimate. Material prices change between the day you bid and the day you buy. Supply chain disruptions, seasonal demand spikes, and regional shortages can move prices 5-15% with little warning.

Material costs have seen significant year-over-year increases, with categories like ready-mix concrete and electrical components rising faster than the overall average. These are national figures. Individual items in specific markets can swing much more.

The 10-15% contingency rule

Experienced contractors build a contingency buffer into their material estimates. The standard range is 10-15%, depending on the project type:

  • New construction (known scope): 10% buffer is usually sufficient
  • Remodeling and renovation: 12-15% buffer, because you never know what is behind the walls
  • Specialty/custom work: 15%+ buffer for one-off materials, custom orders, and longer lead times
  • Insurance restoration: 10% buffer, but make sure your pricing reflects current replacement costs, not depreciated values

How to present it to clients

You do not have to call it a “contingency.” Most successful contractors simply price materials at current market rates plus their buffer, and present a single line item. If the client asks why materials cost X, you explain that pricing includes current supplier rates, delivery, waste factor, and material price protection for the project duration.

Some contractors include a separate “materials escalation clause” in their contracts for longer projects (3+ months), which allows price adjustments if material costs increase beyond a set threshold, typically 5-8%. This is increasingly common and most informed homeowners understand why.

MARGIN TIP

Lock in material pricing with your suppliers whenever possible. Many suppliers will hold a quote for 30-60 days. On larger jobs, consider purchasing materials early and storing them on-site or at your shop to avoid price increases during the project.



3. Track Every Receipt and Expense in Real-Time

This is where solo contractors and small crews bleed money without realizing it. Fittings at the supply house, $47. Lunch for the crew, $38. Gas, $92. Screws from the hardware store, $19. That is $196 in a single day that either gets billed to a job, deducted from taxes, or vanishes as lost profit.

Industry estimates suggest most small contractors miss $3,000 to $5,000 or more in legitimate deductions each year due to poor record-keeping. For contractors with heavy material spend, it can be much worse. Every receipt you lose is money you are giving away.

The shoebox problem

If your expense tracking system involves a shoebox, a glovebox, or a stack of crumpled receipts on your dashboard, you are guaranteed to miss deductions. Thermal paper fades. Receipts get lost. And by the time your CPA sees them in March, nobody remembers which job that $340 Home Depot charge was for.

Real-time tracking changes everything

The fix is simple: capture every receipt the moment you get it. SimplyWise lets you scan receipts with your phone in seconds, automatically categorizing and storing them. The data syncs to your expense records so nothing falls through the cracks. At tax time, every deductible expense is already organized and ready.

Beyond tax savings, real-time expense tracking gives you accurate job costing. When you know exactly what you spent on materials, fuel, meals, and supplies for each project, you can compare actual costs against your estimate. That feedback loop is what makes your next estimate more accurate, which circles back to Strategy #1.

MARGIN TIP

Set a daily rule: no receipt goes in your pocket. It gets scanned immediately or it goes straight into a dedicated envelope in your truck that gets scanned every evening. Make it a non-negotiable habit.



4. Use Change Orders Religiously

Scope creep is the silent profit killer. “While you are in there, can you move that outlet?” “We want the tile all the way to the ceiling now.” “Can you add a coat hook in the mudroom?”

Each one sounds minor. Each one costs time and materials. And if you do not document and charge for them, they stack into hours of unbilled labor and hundreds in unrecovered costs.

Industry research suggests unmanaged change orders can eat 5-10% of total project costs. On a $50,000 job, that is $2,500 to $5,000 walking out the door.

The psychology of change orders

Many contractors, especially those who rely on word-of-mouth referrals, are afraid to push back on small extras. They do not want to seem nickel-and-dime. But there is a professional way to handle it.

The key is setting expectations upfront. In your contract, include clear language that states any work beyond the original scope requires a written change order with agreed pricing before work begins. When the homeowner asks for something extra, you simply say: “Absolutely, I can do that. Let me write up a change order so we are both on the same page about the cost and timeline.”

Most clients respect this. It shows professionalism and protects both parties. Clear, proactive communication is one of the best margin protectors there is.

What a change order should include

  • Description of the additional work in specific terms
  • Additional material costs with quantities
  • Additional labor hours and rate
  • Impact on project timeline if any
  • Client signature before work begins
MARGIN TIP

Keep blank change order forms in your truck or use a digital template on your phone. The faster and easier it is to generate a change order, the more likely you are to actually do it. If it takes 20 minutes to write up, you will skip it on the small stuff, and the small stuff adds up.



5. Know Your True Labor Costs (Burden Rate, Not Just Hourly)

If you think your labor cost is whatever you pay your guys per hour, you are undercharging. The “burden rate,” which is the true, all-in cost of an employee, is significantly higher than the base hourly wage.

What burden rate includes

  • Base hourly wage (the number on the paycheck)
  • FICA/Social Security and Medicare (7.65% of wages, employer share)
  • Federal and state unemployment taxes (FUTA + SUTA, varies by state, typically 2-6%)
  • Workers’ compensation insurance (varies dramatically by trade, 5-30% of payroll for high-risk trades like roofing)
  • General liability insurance (allocated per labor hour)
  • Health insurance, retirement contributions (if offered)
  • Paid time off, holidays, sick days
  • Training time, safety meetings, travel to job site
  • Vehicle costs (if you provide company trucks)
  • Tool wear and replacement

A real example

Say you pay a carpenter $30/hour. Here is what that employee actually costs you:

Cost Component Amount
Base wage $30.00/hr
FICA (7.65%) $2.30/hr
FUTA + SUTA (~4%) $1.20/hr
Workers’ comp (~12% for carpentry) $3.60/hr
GL insurance allocation $1.50/hr
PTO/holidays (5 days + 6 holidays) $1.35/hr
Vehicle allocation $1.50/hr
Tool wear $0.75/hr
True burden rate $42.20/hr

That is a 40.7% burden above the base wage. If you are billing clients based on $30/hour labor, you are losing $12.20 on every hour worked. Over a 2,000-hour year, that is $24,400 in unrecovered costs, per employee.

For solo contractors

Even if you have no employees, you need to calculate your own burden rate. Your self-employment tax (15.3%), insurance, vehicle, tools, licensing, continuing education, and non-billable hours (estimates, meetings, accounting, marketing) all need to be factored into your hourly rate. Most solo contractors find their true burden rate is 1.3x to 1.5x what they thought they needed to charge.

MARGIN TIP

Calculate your burden rate once, update it annually, and use it as the basis for every estimate. If you are a solo operator, track your billable hours for one month. Most contractors find they are only billable 60-70% of their working hours. Your rate needs to account for the other 30-40%.



6. Price for Profit, Not Just to Win the Job

There is a temptation, especially in competitive markets, to shave your price just to get the job. “I will make it up on volume” is the lie that has bankrupted more contractors than any economic downturn.

Industry data shows roughly half of construction businesses close within their first five years. Underbidding and thin margins are consistently cited among the top reasons, alongside poor cash management and lack of financial controls.

The race to the bottom

When you drop your price to match the cheapest bid, you are competing against someone who is either (a) also not making money, (b) cutting corners on materials or labor, or (c) not including the full scope of work. None of those scenarios end well for anyone.

How to price for profit

Start with your costs and work forward. Here is the formula:

Selling Price = (Materials + Labor + Subcontractors + Equipment) / (1 – Desired Margin %)

If your direct costs on a job are $35,000 and you want a 25% gross margin:

$35,000 / (1 – 0.25) = $46,667 selling price

That gives you $11,667 in gross profit. After overhead (typically 10-15% of revenue for small contractors), your net profit on this job would be around $5,000 to $7,000.

Sample job breakdown: $50,000 bathroom remodel

Line Item Amount
Materials (tile, fixtures, lumber, drywall, plumbing supplies) $15,000
Labor (240 hours at $42 burdened rate) $10,080
Subcontractors (electrical, plumbing rough-in) $5,500
Permits and inspections $1,200
Dumpster, delivery, equipment rental $1,800
Material contingency (12%) $1,800
Total Direct Costs $35,380
Overhead allocation (12% of revenue) $6,000
Profit (target 17%) $8,620
Total Selling Price $50,000

That $8,620 net profit represents a 17.2% net margin. Sounds healthy, but remember: one significant missed cost, one untracked change order, one week of delays, and that number drops fast. That is why every other strategy in this article matters.

Communicating value over price

Clients who choose you solely on price will also be the first to complain, the slowest to pay, and the least likely to refer you. The best clients choose on trust, track record, and professionalism. Your job is to clearly communicate the value they get: licensed and insured work, warranty coverage, clean job sites, clear communication, and the peace of mind that the job gets done right. For practical ways to keep clients happy without adding hours to your week, see these communication hacks for contractors.

MARGIN TIP

Never reveal your profit margin to a client. Your price is your price. If asked “what’s your markup?”, redirect to the value: “My price includes licensed labor, full insurance coverage, warranty on workmanship, permit handling, and project management from start to finish.”



7. Manage Your Cash Flow Like Your Business Depends on It (Because It Does)

Profit on paper means nothing if you cannot make payroll on Friday. Cash flow problems kill profitable businesses every day. According to a U.S. Bank study, 82% of small business failures are related to cash flow mismanagement. In construction, the problem is amplified by long payment cycles, front-loaded material costs, and retainage.

The contractor’s cash flow trap

Here is the typical cash flow cycle that sinks small contractors: You buy materials out of pocket (or on 30-day terms). You pay your crew weekly. You invoice at milestones or completion. The client takes 30-45 days to pay. For a 6-week project, you might be carrying $20,000 to $40,000 in costs for 60-90 days before you see payment.

Cash flow protection strategies

  • Collect deposits upfront. 25-50% of total project cost before work begins is standard in residential construction. This covers your initial material purchase and first couple weeks of labor.
  • Structure milestone payments. Break larger projects into 3-5 payment milestones tied to specific deliverables (demo complete, rough-in complete, finish work 50%, final walkthrough). Never get more than 2 weeks ahead of payments received.
  • Invoice immediately. Do not wait until the end of the week or the end of the month. The day a milestone is complete, the invoice goes out.
  • Set clear payment terms. Net 15 is standard for residential work. Net 30 is acceptable for commercial. Anything beyond that, add a late payment fee (1.5% per month is typical and legal in most states).
  • Use supplier credit wisely. Most supply houses offer 30-day terms. Use them to bridge the gap between material purchase and client payment, but never let accounts go overdue or you will lose your credit.
MARGIN TIP

Maintain a cash reserve equal to at least 2-3 months of fixed overhead costs (truck payments, insurance, rent, phone, subscriptions). This buffer prevents you from taking desperation jobs at thin margins just to keep the lights on.



8. Buy Smarter: Supplier Relationships, Bulk Pricing, and Timing

Materials typically represent 40-60% of total project costs, depending on the trade. Even small improvements in how you buy can have outsized impacts on your bottom line.

Build real supplier relationships

The contractors who get the best pricing are not the ones who shop every job to the cheapest supplier. They are the ones who build consistent volume with 2-3 key suppliers and earn preferred pricing.

  • Open a contractor account at your main supply house. Most offer 5-15% below retail for established accounts.
  • Buy in volume when possible. If you have three bathroom remodels coming up, order all the tile, backer board, and thinset at once. Volume discounts of 8-12% are common.
  • Ask for project pricing on larger jobs. Suppliers will often offer additional discounts (3-5%) for a single, large material package rather than piecemeal purchases over weeks.
  • Pay on time, every time. Suppliers reward reliable customers with better terms, priority delivery, and willingness to hold pricing during volatile markets.

Seasonal timing

Material pricing is not constant throughout the year. Lumber typically dips in late fall and winter when demand slows. Concrete is cheapest in the off-season months. Roofing materials see price increases in spring when storm season repair demand spikes.

If you can plan purchases around these cycles, especially for larger jobs, you can shave 3-8% off material costs. That goes straight to your margin.

Do not ignore the small buys

It is easy to focus on the big-ticket items, but consumables add up. Blades, bits, sandpaper, caulk, adhesives, fasteners, tape, PPE. Track what you are spending monthly on these items. Many contractors find they are spending $500 to $1,500 per month on consumables that could be reduced by 20-30% through bulk purchasing or supplier consolidation.

MARGIN TIP

Negotiate delivery fees. Many supply houses charge $75-$150 per delivery. If you are buying $3,000 in materials, that delivery fee is only 2.5-5%, but over 50 deliveries a year it adds up to $3,750 to $7,500. Consolidate orders, pick up when you can, or negotiate free delivery above a spend threshold.



9. Reduce Callbacks and Warranty Work

Every callback is a double hit to your margin. You lose the labor hours and material cost to fix the issue, plus you lose the revenue you would have earned on a paying job during those same hours. For a two-person crew billing at $150/hour, a half-day callback costs you $600 in lost revenue plus whatever it costs to make the repair.

The Joint Center for Housing Studies at Harvard estimates that callbacks and warranty claims cost residential contractors 2-5% of annual revenue. On $500,000 in annual revenue, that is $10,000 to $25,000, money that could be profit if the work was done right the first time.

Common callback causes and prevention

  • Paint failures: Usually caused by insufficient surface prep or painting in wrong conditions (too cold, too humid). Follow manufacturer specs for temperature and humidity ranges. Cost to prevent: 30 extra minutes of prep. Cost to fix: 4-8 hours plus materials.
  • Tile cracks and grout failure: Often caused by improper substrate preparation, wrong thinset for the application, or grouting too soon. Use the right product for the application, and do not rush the cure time.
  • Plumbing leaks: Test every connection under pressure before closing up walls. A $50 pressure test saves a $3,000 water damage claim.
  • Electrical issues: Loose connections cause most residential electrical callbacks. Torque every connection to spec. Double-check every outlet and switch before walkthrough.
  • Door and window alignment: Rushing installation in out-of-square openings leads to sticking, gaps, and air leaks. Take the time to shim and plumb properly.

The walkthrough that prevents callbacks

Before you hand over the keys, do a thorough walkthrough, with the client, checking every item. Use a punch list. It takes an hour, but it catches 90% of the issues that would otherwise become callbacks. An issue caught at walkthrough costs 15 minutes to fix. The same issue caught two weeks later costs half a day.

MARGIN TIP

Take photos of your work at every stage, especially anything that will be hidden behind walls, ceilings, or floors. If a client claims a problem 6 months later, your documentation protects you from warranty claims that are not your responsibility.



10. Know When to Walk Away from a Job

This might be the hardest strategy on the list, and possibly the most important. Not every job is a good job. The ability to recognize a bad fit and decline it is one of the most valuable skills a contractor can develop.

Red flags that signal a margin-killer

  • “Your competitor quoted half that.” If someone’s bid is 50% of yours, they are either leaving out scope, cutting corners, or going out of business. Let them have the job.
  • The client has fired their last two contractors. If everyone else is the problem, the client is the problem. Your margin will not survive their scope creep, decision changes, and unrealistic expectations.
  • Unclear scope or no drawings. “We want a renovation, but we’re still figuring out exactly what we want.” This is a guarantee of scope creep, decision delays, and change orders that the client will fight you on.
  • Payment hesitation. If a client pushes back on a standard deposit, questions your payment schedule, or has a reputation for slow payment, trust your instinct. The cheapest job you will ever do is the one you never get paid for.
  • Unrealistic timeline. “We need this done before Thanksgiving” (said on November 1st for a 6-week project). Rushing leads to mistakes, overtime, and compressed margins.
  • The job is outside your core competency. Stretching into unfamiliar territory sounds like growth but usually means slower production, more mistakes, and thinner margins. Stick to what you do well.

The opportunity cost calculation

Every job you take prevents you from taking another job. If you accept a $30,000 project at 8% margin ($2,400 profit), and it takes 4 weeks, you have earned $600/week in profit. If you could have taken a $25,000 project at 20% margin ($5,000 profit) that takes 3 weeks, you would have earned $1,667/week in profit, nearly three times more per week.

When your schedule is full or nearly full, the math shifts from “should I take this job?” to “is this the most profitable use of my time?”

MARGIN TIP

Calculate your minimum acceptable margin before you start bidding. For most contractors, anything below 15% gross margin is not worth the risk. Factor in your overhead burden and you might find that 15% gross is actually 2-3% net, which means any hiccup puts you underwater.



Putting It All Together: The Margin Protection System

No single strategy on this list will transform your business overnight. But implementing all 10 creates a system that compounds over time. When your estimates are accurate, your expenses are tracked, your change orders are documented, and you are pricing for profit, the math starts working in your favor.

Here is how a typical contractor’s margin improves by adopting these strategies:

Strategy Typical Margin Impact
Accurate estimating +2-5%
Material cost buffer +1-3% (avoided overruns)
Real-time expense tracking +1-2% (tax savings + job costing)
Disciplined change orders +2-4%
True labor cost pricing +3-5%
Profit-first pricing +2-4%
Cash flow management +1-2% (reduced interest/desperation pricing)
Smarter purchasing +1-3%
Reduced callbacks +1-2%
Job selectivity +2-5%

Combined, a contractor who seriously implements these strategies can realistically improve their net margin by 8-15 percentage points. On $500,000 in annual revenue, that is $40,000 to $75,000 more in your pocket.

Tools help. SimplyWise handles three of the biggest margin levers: accurate estimates from photos in seconds, real-time receipt scanning and expense tracking, and mileage tracking that captures every deductible mile. At $30/month, it pays for itself on the first job of the month.

And once your margins are healthy, the next step is filling your pipeline with the right jobs. Here are marketing prompts that actually get contractors more leads.



Frequently Asked Questions

What is a good profit margin for a general contractor?
The average GC nets 3.9-6.1%, but that is the average. Well-run GC businesses consistently hit 8-12% net margins. Gross margins run 15-22% for new construction and 25-35% for remodeling. The gap between gross and net? That is your overhead: insurance, vehicles, office costs, and all the hours you are not billing for.
How do I figure out what an employee really costs me?
Start with the base hourly wage and add FICA (7.65%), unemployment taxes (2-6%), workers’ comp (5-30% depending on trade), GL insurance, vehicle costs, tool replacement, and PTO. For most trades, the real number is 1.3x to 1.5x the base wage. Your $30/hour carpenter actually costs $39 to $45/hour once everything is factored in.
How much contingency should I add for materials?
10-15% is the standard. Use 10% for straightforward new construction with known scope. Go 12-15% for renovation work where you never know what is behind the walls. Custom or specialty work with long lead times? 15% or more to cover pricing swings and reorders.
What do I say when a client tells me my price is too high?
Shift the conversation from price to value. Walk them through what is included: licensed and insured work, permits, cleanup, warranty, and project management. Ask what the cheaper bid covers. Often those quotes leave out scope items, use lower-grade materials, or skip permits and cleanup. If price is the only thing that matters to them, they are not your client. You will make more money working for people who value quality.
Should I charge for estimates?
For smaller jobs (under $5,000), free estimates are still standard. For larger projects that need detailed plans and takeoffs, many contractors charge $150-$500 for a detailed estimate and credit it toward the project if hired. That filters out tire-kickers fast. Tools like SimplyWise cut the time per estimate down to seconds, so either way you are spending less time on bids that go nowhere.
What is the number one pricing mistake contractors make?
Not knowing their true overhead costs. Too many guys add up materials + labor + profit and call it a day. They forget insurance, vehicle costs, tool replacement, non-billable time (driving, estimating, admin, marketing), licensing, and accounting. Those overhead items typically add 10-18% to your break-even point. Miss that and every job looks profitable on paper but bleeds money in reality.
How much deposit should I collect before starting?
25-50% of total project cost is standard for residential work. Some states cap deposit amounts, so check your local rules. The deposit should cover your initial material buy and first phase of labor. Structure the rest as milestone payments tied to deliverables so you are never more than 1-2 weeks ahead of what you have collected.
How do I track job-site expenses without drowning in paperwork?
Use a receipt scanning app like SimplyWise. Snap a photo of every receipt on the spot. Five seconds, done. The app categorizes and stores everything automatically. At the end of the month or tax time, every expense is already sorted by date, category, and amount. The trick is making it a reflex: scan it the moment you get it, every single time.
When should I walk away from a job?
Walk away when: the client has fired multiple previous contractors, the scope is undefined and they resist defining it, they push back on a standard deposit or payment schedule, the timeline is unrealistic, or you would need to bid below your floor to win. Know your minimum margin before you bid. For most contractors, anything below 15% gross is not worth the risk once you account for surprises.
Can I improve my margins without raising prices?
Absolutely. Focus on costs: reduce callbacks through better QC, negotiate better material pricing through volume and supplier loyalty, track every expense to max out tax deductions, kill scope creep with disciplined change orders, and tighten your estimates so you stop leaving money on the table. Most contractors can improve net margins by 5-10 percentage points through operational improvements alone. No price increase needed.



Accurate estimates, organized expenses, and tracked mileage. SimplyWise gives contractors the tools to protect their profit margin on every job, starting at $30/month.